Cannon Technologies

Scope of Project: Design, supply and Commission a Chilled water System, serving the cooling requirements of Cannon specific Data Centre equipment.

Job Specifics: Strategic Government Facility in a High ambient environment and special voltage requirement (460V/3Ph/60Hz) with Run and Standby equipment for 24/7-365 operation. BMS Control panel monitoring requirements of strategic operational information, reporting to PC’s in Technical centre H.Q.
Local company to install equipment in line with design drawings, specifications and schematics provided by our team.

The Expert Touch:  We have over 40 years’ experience designing, building and installing be-spoke Chilled Water and BMS solutions for all sorts of process manufacturing requirements. Many of which have been in other countries in all parts of the world and continue to be supported by our service department, bespoke manufacturing facilities and BMS/Control Systems logging and bureaux desk.

Principle equipment installed: We manufactured and configured Trend Control/ Building Management System and networking facilities, Associated flow meters, sensors, Thermometers and pressure transducers, Two Parker Hiross 75KW air cooled R&S water chillers complete with integral Buffer Tanks and Stainless steel circulating pumps.

August 2013