Client: Rothmans International / BAT Ltd

Scope of Project: Design, build, supply and install Close Control Air Conditioning Services to serve a purpose built Primary and Secondary manufacturing facility.

Location: St Petersburg, Russia.

Value: £750,000

Job Specifics: Close control of the temperature and the relative humidity across all areas of the facility to + / – 1deg.K and + / – 2%RH. Conditioning 150m3/second of air with up to 1400Kw of chilled water cooling and 10,000Kg/hr of live steam heating and humidification. With outside conditions capable of varying between 30deg.C in the summer and -30deg.C in the winter.

The Greenworks Controlled Environments Touch: We have over 40 years’ experience designing, building and installing be-spoke air conditioning solutions for all sorts of process manufacturing requirements. Many of which have been in other countries in all parts of the world and continue to be supported by our service department, bespoke manufacturing facilities and BMS/Control Systems logging and bureaux desk.

Principal equipment installed: 7- Bespoke manufactured Air Handling Units, 2- Carrier air cooled water chillers, 2- Searle GEA Dry air water coolers, Lowara pumps and Greenworks configured Trend Control/ Building Management System.